Case study

Söderenergi combined heat and power plant, Södertälje

Removal of two existing feed chutes and installation of two austenitic stainless steel replacements.

Tepláreň Söderenergi v Södertälje, Švédsko
Project overview
// Location Södertälje, Sweden
// Realisation June 2026

Removal of two existing feed chutes and installation of two austenitic stainless steel replacements.

Söderenergi supplies district heating to approximately 300,000 residents, as well as offices and industrial facilities in the southern Stockholm region. It also generates enough electricity to supply around 100,000 homes.

The company converts around one million tonnes of waste into energy each year, with roughly half delivered by ship to its port in Södertälje. Most of its energy production takes place at Igelsta, home to one of Sweden’s largest biomass-fired combined heat and power plants.

Project Scope

Our team removed two existing feed chutes and installed two replacements made of austenitic chromium-nickel stainless steel. The existing chutes were cut into smaller sections so they could be lifted and moved out of the work area. The replacements were installed in sections, with on-site adjustments and minor modifications needed to achieve the correct fit.